Assume that your firm makes four products A, B, C and D. Data for the past period are as follows:
|
Product |
Output Units |
Production Runs in Period |
Direct Labour Hours per Unit |
Machine Hours per Unit |
Material Cost per Unit |
Material Components per Unit |
|
A |
25 |
3 |
2 |
2 |
30 |
8 |
|
B |
25 |
4 |
4 |
4 |
75 |
5 |
|
C |
250 |
7 |
2 |
2 |
30 |
8 |
|
D |
250 |
10 |
4 |
4 |
75 |
6 |
|
Total |
|
24 |
|
|
|
|
Direct Labour costs £7 per hour.
Overhead Costs:
Material Handling Costs £7650
Short Run Variable Costs £8250
Long Run Variable Costs:
Scheduling £7680
Set Up Costs £3600
Total £27180
Find the unit production cost:
a) Using labour hours or machine hours overhead recovery rate;
b) Using Activity Based Costing with the following cost drivers:
a. Short Term Variable Costs – Machine Hours
b. Scheduling Costs - Number of Production Runs
c. Set Up Costs – Number of Production Runs
d. Material Handling Costs – Number of Components
c) Compare the results from the two methods